Original source · versioned page text
2021-10-12 Services & Organisation Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 OCTOBER 2021
Eleven (11) responses were received within the VendorPanel e-portal from the following suppliers
in alphabetical order:
Aaction Traffic Control Pty Ltd
Altus Traffic Pty Ltd
East Coast Traffic Controllers Pty Ltd
Guardrite Security and Traffic Management Qld Pty
Schramm Group Pty Ltd
The Traffic Design Company Pty Ltd
Traffex Australia Pty Ltd
Traffic Management People
Traffic Qld Pty Ltd
Verifact Traffic Pty Ltd
Warp Qld Pty Ltd
After an initial compliance review of each of the responses to ensure responses met the minimum
tender requirements, Warp Qld Pty Ltd did not provide a response via the Council’s response
documentation and therefore was deemed non-conforming, leaving ten (10) conforming submissions
for evaluation.
2. Tender Evaluation
The conforming tenderers were evaluated using the Council’s Weighted Attribute Evaluation
spreadsheet against the following evaluation criteria and weightings:
Criteria Weighting
Price 35%
Capability & Resourcing 10%
Contract Experience & Capacity 10%
Quality 5%
Methodology 10%
Health & Safety 15%
Environment & Sustainability 5%
Contribution to Local Economy 10%
The evaluation was conducted by the Evaluation Panel that consisted of the following members of
staff:
Works Maintenance Coordinator (Contract Administrator)
Civil Operations: Maintenance Planning Coordinator
Technical Officer - Parks and Gardens
Workplace Health and Safety Advisor (Safety Only)
Technical Officer Civil Operations
Each member of the Evaluation Panel read and declared that they understood and accepted the
probity requirements, which includes a declaration of conflicts of interest and confidentiality.
The tender submission from The Traffic Design Company Pty Ltd proposed design services for traffic
management plans and traffic guidance schemes and did not provide a response specifically for
traffic control services. Therefore, the tender from The Traffic Design Company Pty Ltd was not
evaluated as it did not provide the complete traffic control service sought by Council.
A pricing scenario was developed to evaluate the pricing (schedule of rates) based on current traffic
control activities. The lowest priced submission was tendered by Traffic Management People Pty Ltd
ATF the Abrahamson Family Trust. The pricing by Traffic Management People Pty Ltd ATF the
Abrahamson Family Trust was consistent with the current contract rates with very little deviation.
Attachment 1 – Evaluation Spreadsheet presents the evaluation outcome of the conforming
submissions against the above criteria.
Page 13 of 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.