Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                      AND

                                      S79.2 Where the site adjoins a         S79.2 Not Applicable
                                      Residential Use or land included
                                      in a residential zone—                 The site does not adjoin a
                                                                             Residential Use or land included
                                      a) a 2m high solid screen fence is     in a residential zone.
                                      provided along the common
                                      boundaries; and

                                      b) hours of operation are limited to
                                      between 7.00 am and 10.00 pm

Site Layout & Design

O80 Buildings, structures,            S80.1 Fuel pumps are not less          S80.1 Complies
driveways, tanks and fuel bowsers     than 8m from any frontage;
are sited to—                                                                Fuel pumps are located 18.94m
                                      AND                                    from the Eumundi Noosa Road
a) ensure the safe and efficient                                             frontage.
use of the site;
                                      S80.2 Inlets to bulk fuel storage      S80.2 Complies
b) maintain visual amenity and        tanks are located so tankers stand
streetscape character;                wholly within the site and on level    The bulk fuel storage is located
                                      ground while discharging fuel into     wholly within the site and on level
c) provide adequate separation to     tanks.                                 ground.
adjoining land uses; and

d) not cause an environmental
nuisance to neighbouring
properties.

O81 Customer air and water            S81.1 Customer air and water           S81.1 Complies
facilities, and any automatic         facilities, and any car washing
mechanical car washing facilities     facilities are setback 5m from any     The site does not adjoin any
are located such that—                residential property boundary.         residential property boundary.

a) vehicles using or waiting to use
such facilities are standing wholly
within the site; and

b) an adequate buffer area can be
provided to any adjoining
Residential Use.

O82 The layout and design of the      S82.1 Sealed impervious surfaces       S82.1 Complies
service station ensures that on       are provided where potential spills
site operations do not cause any      of contaminants may occur;             The fuel bowers are sealed with
environmental nuisance or harm                                               impervious surfaces.
or result in the release of           AND




                                                                                                               URBIS
APPENDICES                                                                                      NOOSA ENERGY CENTRE
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.