3. FINAL-160721-BA4090-Town Planning Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.
where such crossings are S10.4 Native vegetation is
unavoidable, disturbed areas are protected from clearing or
reinstated and revegetated on construction activities by—
completion of works; and
a) clearly marking vegetation to be
e) minimise bulk earthworks. retained with flagging tap;
b) installing protective fencing
around the dripline of vegetation;
and
c) ensuring stock piling, storage
and vehicle parking occur outside
the areas of vegetation to be
retained;
S10.5 Low impact construction
techniques are used around areas
of vegetation to be retained to
minimise interference with the
vegetation.
O11 Roads and stormwater No solution provided O11 Complies
drainage infrastructure is proven
to be suitable for its use prior to A Stormwater Management Plan
Council accepting the dedicated has been prepared for the site.
asset. The Stormwater Management
Plan indicates that the
development can be carried out in
accordance with Council’s
stormwater drainage
requirements.
Please refer to the Stormwater
Management Plan attached in
Volume 5.
O12 Alignment of stormwater S12.1 The location, design and S12.1 Complies
drainage infrastructure is to allow construction of stormwater
for easy access for the ongoing drainage structures is in A Stormwater Management Plan
maintenance by Council. accordance with Sections 4 and 5 has been prepared for the site.
of PSP5, Engineering Design The Stormwater Management
Standards - Roads, Drainage and Plan indicates that the
Earthworks; development can be carried out in
accordance with Council’s
AND stormwater drainage
requirements.
S12.2 Where infrastructure is
located on private land an Please refer to the Stormwater
easement is dedicated over the Management Plan attached in
infrastructure in accordance with Volume 5.
Section 4 of PSP 5, Engineering
Design Standards – Roads,
URBIS
APPENDICES NOOSA ENERGY CENTRE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.