3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

where such crossings are              S10.4 Native vegetation is
unavoidable, disturbed areas are      protected from clearing or
reinstated and revegetated on         construction activities by—
completion of works; and
                                      a) clearly marking vegetation to be
e) minimise bulk earthworks.          retained with flagging tap;

                                      b) installing protective fencing
                                      around the dripline of vegetation;
                                      and

                                      c) ensuring stock piling, storage
                                      and vehicle parking occur outside
                                      the areas of vegetation to be
                                      retained;

                                      S10.5 Low impact construction
                                      techniques are used around areas
                                      of vegetation to be retained to
                                      minimise interference with the
                                      vegetation.

O11 Roads and stormwater              No solution provided                  O11 Complies
drainage infrastructure is proven
to be suitable for its use prior to                                         A Stormwater Management Plan
Council accepting the dedicated                                             has been prepared for the site.
asset.                                                                      The Stormwater Management
                                                                            Plan indicates that the
                                                                            development can be carried out in
                                                                            accordance with Council’s
                                                                            stormwater drainage
                                                                            requirements.

                                                                            Please refer to the Stormwater
                                                                            Management Plan attached in
                                                                            Volume 5.

O12 Alignment of stormwater           S12.1 The location, design and        S12.1 Complies
drainage infrastructure is to allow   construction of stormwater
for easy access for the ongoing       drainage structures is in             A Stormwater Management Plan
maintenance by Council.               accordance with Sections 4 and 5      has been prepared for the site.
                                      of PSP5, Engineering Design           The Stormwater Management
                                      Standards - Roads, Drainage and       Plan indicates that the
                                      Earthworks;                           development can be carried out in
                                                                            accordance with Council’s
                                      AND                                   stormwater drainage
                                                                            requirements.
                                      S12.2 Where infrastructure is
                                      located on private land an            Please refer to the Stormwater
                                      easement is dedicated over the        Management Plan attached in
                                      infrastructure in accordance with     Volume 5.
                                      Section 4 of PSP 5, Engineering
                                      Design Standards – Roads,



                                                                                                             URBIS
APPENDICES                                                                                    NOOSA ENERGY CENTRE
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.