3. FINAL-160721-BA4090-Town Planning Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.
Drainage and Earthworks.
14.148 Frontage works
O13 Development is provided with S13.1 The following infrastructure S13.1 Complies
external roadworks along the full components already exist at the
extent of the frontage of the site to frontage of the site or are provided The frontage of the site is
an appropriate standard having at the developer’s expense— equipped with all the required
regard to the specified function of infrastructure components.
the road. a) full width sealed road;
b) concrete kerb and channel
where appropriate;
c) forming and grading to
footpaths;
d) vehicular kerb and footpath
crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public
utility mains, services or
installations;
i) construction of any required
alterations to public utility mains,
services or installations;
j) stormwater drainage works; and
k) installation of electrical
conduits;
S13.2 Road and drainage design S13.2 Complies
and construction is in accordance
with Sections 3 and 4 of PSP5 A Stormwater Management Plan
Engineering Design Standards – has been prepared for the site.
Roads, Drainage and Earthworks. The Stormwater Management
Plan indicates that the
development can be carried out in
accordance with Council’s
stormwater drainage
requirements.
Please refer to the Stormwater
Management Plan attached in
Volume 5.
URBIS
NOOSA ENERGY CENTRE APPENDICES
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.