3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

c) ensure carparking areas can         S17.2 Where Council                  S17.2 Complies
be adequately drained;                 infrastructure is available—
                                                                            The proposal ensures that the
d) ensure drainage does not            a) any drainage (including           infrastructure is designed and
adversely impact upon other            buildings and yards) flows to that   constructed to withstand the
premises; and                          infrastructure; and                  impacts of flood and storm tide
                                                                            hazard events. Due to an existing
e) ensure filling or excavation        b) the infrastructure has the        building on site that operated
does not adversely impact upon         capacity to accept any additional    with the use of the existing
other premises by—                     loading;                             drainage flows to infrastructure,
                                                                            this drainage infrastructure
i. causing ponding on the site or      AND
                                                                            should therefore withstand future
nearby land;
                                                                            flows.
ii. increasing flooding, which
                                       S17.3 For Residential Uses—          S17.3 Not Applicable
adversely affects the safety or
use of any land upstream and           a) where slab on ground              The proposal is for a service
downstream; and                        construction is used, filling does   station and does not include
                                       not extend more than 1m beyond       residential uses.
iii. adversely affecting the flow of
                                       the building footprint and access
water in any overland flow path.
                                       to car parking areas, measured
                                       from the outer walls of the
                                       building ; or

                                       b) the design consists of a
                                       suspended floor construction;

                                       AND

                                       S17.4 Car parking and                S17.4 Complies
                                       manoeuvring areas are
                                       constructed at a level that          The proposed lawful point of
                                       permits the parking area to drain    discharge for the stormwater is
                                       from the site by gravity means,      the existing gully pits located on
                                       without the need for mechanical      Project Avenue. The details for
                                       pumping;                             the proposed stormwater
                                                                            management and detention tank
                                       AND                                  are outlined in Volume 5 of the
                                                                            Stormwater Management Plan.

                                       S17.5 Basements for residential      S17.5 Not Applicable
                                       uses have flood immunity above
                                       the Q100 where alternative           The proposal does not include
                                       means to mechanical pumping          the provision of a basement for
                                       are used to achieve such             residential uses.
                                       immunity; or




                                                                                                                      URBIS
APPENDICES                                                                        FINAL-160721-BA4090-TOWN PLANNING REPORT
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.