OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance outcomes

Acceptable outcomes

Response

Comment
wall.

 

PO4 Development avoids the release of
hazardous materials as a result of a
natural hazard event.

Editor's note: Applications should:

(1) assess the risk of storm tide inundation
releasing or otherwise exposing
hazardous materials, including
appropriate emergency planning and
contingency measures.

(2) applications are to be supported by a
report certified by a Registered
Professional Engineer of Queensland
(RPEQ) that demonstrates this
performance outcome will be achieved.

A04.1 Development that involves the manufacture or

storage of hazardous materials in bulk are designed to:

(1) prevent the intrusion of waters from a defined storm
tide event into structures or facilities containing the
hazardous materials, or

(2) ensure hazardous materials remain secured despite
inundation, including secure from the effects of
hydrodynamic forcing associated with wave action or
flowing water.

There will be no manufacture or storage of hazardous
materials in bulk associated with the proposed works.

 

 

PO5 Natural processes and the
protective function of landforms and
vegetation are maintained in coastal
hazard areas.

 

AO5.1 Development in an erosion prone area within the

coastal management district:

(1) maintains vegetation on coastal landforms where its
removal or damage may:

(a) destablise the area and increase the potential
for erosion, or
(b) interrupt natural sediment trapping processes or
dune or land building processes

(2) maintains sediment volumes of dunes and near-shore
coastal landforms, or where a reduction in sediment
volumes cannot be avoided, increased risks to
development from coastal erosion are mitigated by
location, design, construction and operating
standards

(3) minimises the need for erosion control structures or
riverbank hardening through location, design and
construction standards

(4) maintains physical coastal processes outside the
development footprint for the development, including
longshore transport of sediment along the coast

(5) reduces the risk of shoreline erosion for areas
adjacent to the development footprint unless the
development is an erosion control structure

(6) reduces the risk of shoreline erosion for areas
adjacent to the development footprint to the
maximum extent feasible in the case of erosion
control structures.

 

 

The proposal is replacement of an existing revetment wall
and repair of the road. Natural processes and the protective
function of natural landforms and vegetation be remain
consistent with the current situation.

 

 

State development assessment provisions
10 October 2014 V1.5

Module 10 — Coastal protection

10.1 Tidal works, or development in a coastal management district state code

Page 3 of 16

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.