OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

     

Performance outcomes

necessary to protect coastal
resources or physical coastal
processes.

   
 

 
 

Acceptable outcomes Response

 
 

   
 
 

  

 

Table 10.1.2: Operational work
Performance outcomes

PO1 Tidal works that is private marine
development does not result in adverse
impacts to tidal land.

Editor's note: In addressing this performance
outcome, the applicant should also have
regard to requirements for private marine
development in the prescribed tidal works
code in the Coastal Protection and
Management Regulation 2003.

    
  

Editor's note: Applications should be
supported by a report certified by an RPEQ to
demonstrate compliance with this performance
outcome.

 

    
   

    
   

Acceptable outcomes

AO1.1 The location and design of tidal works that is
private marine development:

(1) is on private land abutting tidal water and used for
property access purposes

occupies the minimum area reasonably required for
its designed purpose

is not to be roofed or otherwise covered

does not require the construction of coastal protection
works, shoreline or riverbank hardening or dredging
for marine access

does not adversely impact on public safety or public
access and use of the foreshore.

Response

(2)

(3)
(4)

(5)

  

Comment

   

Na — the works are for a public, not private purpose.

 

PO2 Development does not result in the

disposal of material dredged from an

artificial waterway into coastal waters,

with the exception of:

(1) reclamation works, or

(2) coastal protection works, or

(3) the maintenance of an existing
artificial waterway and the at-sea
disposal of material that has
previously been approved for the
waterway.

No acceptable outcome is prescribed.

Na — no dredging is proposed

 

PO3 The design and construction of an
artificial waterway maintains coastal
landforms.

 

AO3.1 The design and construction of the artificial
waterway provides for sand bypassing where this is
necessary to prevent erosion of adjacent coasts and
minimise sedimentation of the waterway.

AND

Na - the proposed works is not for construction of an
artificial waterway

 

AO3.2 Clean sand accumulating within an artificial
waterway is returned to the active beach system, in
preference to disposal on land.

 

 

Na - the proposed works is not for construction of an
artificial waterway

 

 

 

State development assessment provisions
10 October 2014 V1.5

Module 10 — Coastal protection

10.1 Tidal works, or development in a coastal management district state code
Page 12 of 16

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.