Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes
necessary to protect coastal
resources or physical coastal
processes.
Acceptable outcomes Response
Table 10.1.2: Operational work
Performance outcomes
PO1 Tidal works that is private marine
development does not result in adverse
impacts to tidal land.
Editor's note: In addressing this performance
outcome, the applicant should also have
regard to requirements for private marine
development in the prescribed tidal works
code in the Coastal Protection and
Management Regulation 2003.
Editor's note: Applications should be
supported by a report certified by an RPEQ to
demonstrate compliance with this performance
outcome.
Acceptable outcomes
AO1.1 The location and design of tidal works that is
private marine development:
(1) is on private land abutting tidal water and used for
property access purposes
occupies the minimum area reasonably required for
its designed purpose
is not to be roofed or otherwise covered
does not require the construction of coastal protection
works, shoreline or riverbank hardening or dredging
for marine access
does not adversely impact on public safety or public
access and use of the foreshore.
Response
(2)
(3)
(4)
(5)
Comment
Na — the works are for a public, not private purpose.
PO2 Development does not result in the
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
artificial waterway and the at-sea
disposal of material that has
previously been approved for the
waterway.
No acceptable outcome is prescribed.
Na — no dredging is proposed
PO3 The design and construction of an
artificial waterway maintains coastal
landforms.
AO3.1 The design and construction of the artificial
waterway provides for sand bypassing where this is
necessary to prevent erosion of adjacent coasts and
minimise sedimentation of the waterway.
AND
Na - the proposed works is not for construction of an
artificial waterway
AO3.2 Clean sand accumulating within an artificial
waterway is returned to the active beach system, in
preference to disposal on land.
Na - the proposed works is not for construction of an
artificial waterway
State development assessment provisions
10 October 2014 V1.5
Module 10 — Coastal protection
10.1 Tidal works, or development in a coastal management district state code
Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.