Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes Response Comment P04 Development that involves dredging | AO4.1 A management plan for the development: Na - the proposed works do no involve dredging includes and complies with a (1) directs the operation of the development management plan that demonstrates how | (2) identifies disposal methods and disposal sites for the environmental impacts will be managed removed material for the construction and operational and mitigated, and how the requirements phases of the development of the National assessment guidelines for | (3) outlines how any adverse effects from extraction dredging, Australia Government activities on sediment transport processes or Department of the Environment, Water, adjacent coastal landforms will be mitigated or Heritage and the Arts, 2009 will be met. otherwise remediated by suitably planned and implemented beach nourishment and rehabilitation works. Editor's note: The development should comply with the National assessment guidelines for dredging, Australian Government Department of Environment, Water, Heritage and the Arts, 2009. AND A0O4.2 For land based disposal of dredged material, any Na - the proposed works do no involve dredging area used for storing, dewatering, drying or rehandling dredged material as outlined in the dredge management plan is: (1) of sufficient size for the projected volume of dredged material from relevant capital or maintenance dredging (2) protected from future development that would compromise the use of the area for its intended purpose of material storage and dewatering. AND A04.3 For at-sea disposal of suitable dredged material, Na - the proposed works do no involve dredging the dredge management plan specifies that material is placed at a dredged material disposal site only if it is demonstrated that it is not feasible to: (1) dispose of the material above the high water mark, if the material is from maintenance works for an existing artificial waterway for which at-sea disposal was previously approved, or (2) keep the dredged material within the active sediment transport system for the locality, or (3) use the material for beach nourishment or another beneficial purpose. AND A04.4 For at-sea disposal of dredged material where the State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code 10 October 2014 V1.5 Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.