Performance outcomes Acceptable outcomes marine spoil disposal site is a retentive (ie. non- dispersive) site, the disposal site identified in the dredge management plan has the capacity to hold and retain the material within its boundaries during construction and operation of the development. Editor's note: The use of dredged material for a beneficial purpose could include development of port or other marine facilities, use for construction or industrial purposes, or use to create or modify land or waters for an approved environmental outcome (such as creation of a bird roosting site). Further information about beneficial uses is contained in the National assessment guidelines for dredging, Australian Government Department of Environment, Water, Heritage and the Arts, 2009 Response Comment Within a strategic environmental area: ri Parian and wildlife corridor functions POS Where clearing of native marine plants cannot be avoided and the extent of clearing has been minimised, an environmental offsets is provided for any significant residual impact from the clearing. AO5.1 Clearing of marine plants is minimised and an environmental offset is for any significant residual impact from the clearing AND AO5.2 Any clearing of marine plants is limited to the minimum area required for the works and to allow for maintenance. PO6 Natural regeneration of any cleared or work areas is facilitated AO6.1 There is no impediments to the natural regeneration of native plant species in the area of clearing and works following completion of works. PO7 Development avoids or minimises adverse impacts on fish passage. AO 7.1 Development avoids, or minimises adverse impacts on fish passage during works and the carrying out of the activity. PO8 Development avoids or minimises impacts on fish habitat values. AO8.1 Works are located, designed, and constructed to minimise impacts on fish habitat values and function. Within a strategic environmental area: h ydrological processes | PO9 Development avoids or minimises impacts on natural drainage lines or flow paths, during both construction and No acceptable outcome is prescribed. operation. Within a strategic environmental area: water quality State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.