Skip to the record
Accept no imitations.

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

Specific Outcome A probable Solution Comments

of buildings or other structures in the

work’s

immediate surroundings or the

locality within which the work

is located—the stated desired

height, scale or size.
wChlarectemariolame nitya inatenialstanchcolouns

      
 

     
 

      
 

    

 

ke ts reas ge i
The materials and colours proposed in the revetment wali

 

4.1 The materials used for, and the The materials used for, and colours of,

colours of, prescribed tidal work are the prescribed tidal work are consistent are the same as the existing revetment wail that will remain
compatible with the character and with each relevant planning scheme on either side of the proposed repair works.

amenity of the work’s location, standard.

having regard to the following—
(a) the natural features of the
work’s immediate surroundings
and the locality within which the
work is located;

(b) the existing buildings or other
structures in the work’s

immediate surroundings and the
locality within which the work

is located;

(c) if the relevant planning scheme
states the desired materials to be
used for, or desired colours of,
buildings or other structures in

the work’s immediate
surroundings or the locality

within which the work is
located—the stated desired
materials or colours

   
   
  

       

5.1 Lighting, other than an aid to The lighting for the prescribed tidal The proposed revetment wall will be located outside the
navigation, for prescribed tidal work is work, other than an aid to navigation, is navigable channel and as such it is not considered that
installed in a way to ensure the security | consistent with the following lighting is necessary.

and safe use of the work without standards—

causing significant adverse effects on (a) subject to paragraph (c), lighting
the amenity of the locality within which for prescribed tidal work is hooded
the work is located. and directed downwards;

 

 

 

 

 

3|Page

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.