Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

Specific Outcome

6.1 A sign erected or otherwise placed
in position for prescribed tidal work,
other than a sign erected or placed for
safety reasons or under an Act—

amenity of the work’s immediate
surroundings and the locality within
which the work is located; and

(b) is not a dominant feature of the
work, unless the dominance is

for safety reasons.

 

   

(a) is compatible with the character and

A probable Solution

(b) subject to paragraph ({c), each
lighting standard, to the extent
relevant;

(c) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph (a)
or (b}—the relevant planning

scheme standard, to the extent the
standard is more stringent than the
standard mentioned in paragraph (a)
or (b);

(d) any other relevant planning scheme
standard that is not inconsistent

with the standards mentioned in
paragraphs (a) to (c

   
 

A sign erected or otherwise placed in
position for prescribed tidal work, other
than a sign erected or placed for safety
reasons or under an Act, is consistent
with the following standards—

{a) subject to paragraph (c), a sign
erected or placed in position for
identifying prescribed tidal wark, or
the owner of the work, is the only
sign erected or placed in position

for identifying the work or owner;

(b) subject to paragraph (c), a sign
erected or otherwise placed in
position for prescribed tidal work is
integrated into the design and
construction of the work;

(c) if a relevant planning scheme
standard is more siringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more
stringent than the standard

 

 
        

 

Comments

No signage is proposed

 

 

4|Page

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.