Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Coastal Protection and Management Regulation 2003 Schedule 4A Assessment of Compliance Specific Outcome RE aiihwondandivegetationnns - 7.1 Excavation and filling for prescribed tidal work— (a) is carried out only to the extent reasonably necessary for the work; and (b) does not have a significant adverse effect on— (i) the natural features of the tidal water under, within or over which the work is located; or (ii) the level of the surface of the land under the tidal water under, within or over which the work is located, or any foreshores near the work. A probable Solution mentioned in paragraph (a); (d) any other relevant planning scheme standard that is not inconsistent with the standards mentioned in paragraphs (a), (b) and (c). e earthwork and filling for the prescribed tidal work is consistent with each relevant planning scheme standard. ore a ed (a) in the interest of minimising costs whilst ensuring the revetment wall is structurally sound, the works have been designed to utilise as minimal rock and occupy as minimal footprint as is necessary. (b)(i)The area is already highly modified and therefore the reinstatement of the revetment wail is unlikely to significantly affect natural features of the tidal water. (b)(ii)the works will increase the volume of artificial structure under tidal water at Highest Astronomical tide by approximately 30m*. Given the relatively large width of the river in the area of the works, along with the existing hard structured training walls on either side of the works, it is not anticipated that the amount of additional rock filling reinstatement/repair of the existing rock revetment will significantly affect the hydrodynamics and tidal prisms in the area. Despite this, as a project separate to this application, Council is currently considering engaging a hydrodynamic study for the entire Noosa River System. This will enable the actual impact of all existing and future works in the river to be predicted and managed appropriately. Due to the impending failure of the road as a result of the dilapidated existing revetment wall, it is not possible to await to results of the hydrodynamic study prior to proceeding with reinstatement of the revetment wall. 7.2 The location of prescribed tidal work ensures vegetation is cleared or disturbed only to the extent reasonably necessary for the work. The vegetation in the tidal water, under within or over which the prescribed tidal work is located, or on land under the tidal water, is cleared or disturbed in a way No vegetation will be disturbed as a result of the prescribed tidal works. 5 | Pag e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.