Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance
Specific Outcome
A probable Solution
consistent with each relevant planning
scheme standard.
Comments
7.3 Any vegetation damaged, destroyed
or removed by prescribed tidal work
under, within or over tidal water
other than an artificial waterway, is
replaced with appropriate vegetation.
spubliclaccessemavall
8.1 Prescribed tidal work does not have
a significant adverse effect on the
availability of public access to
foreshores, including public access
proposed in the relevant planning
scheme.
Vegetation affected by the prescribed
tidal work is dealt with in a way
consistent with the following
standards—
(a) subject to paragraph (b), vegetation
damaged, destroyed or removed by
prescribed tidal work is replaced
with native vegetation for the
locality within which the work is
located, to the extent it is
reasonably practicable to replace
the vegetation with native
vegetation;
{b) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph
(a}—the relevant planning scheme
standard, to the extent it is more
stringent than the standard
mentioned in paragraph {a);
(c) any other relevant planning scheme
standard that is not inconsistent with
the standards mentioned in
hs
The design and construction of the
prescribed tidal work is consistent with
the following standards—
(a) subject to paragraph (b), prescribed
tidal work does not involve the
erection or placement of any
physical barrier preventing existing
access, along a public accessway, to the
foreshores near the work;
{b) if a relevant planning scheme standard
is more stringent than the standard
No vegetation will be disturbed as a result of the prescribed
tidal works.
The prescribed tidal work is necessary to reinstate safe
pedestrian access along the river foreshore footpath. The
dilapidated footpath currently has grades and cross falls that
are not compliant with the Noosa Planning Scheme Policy
5. The following aspects of the design will allow the pathway
to comply with Noosa Planning Scheme Policy 5:
e The section of footpath is part of the overall pathway
network that provides access between the restaurant
and recreation areas of Gympie Terrace to
Backpackers, camping grounds etc.
6|/Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.