Council archive · source document
SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published] · 132002.220460.4
31. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
32. A Development Permit for Operational Works shall be obtained prior to the commencement
of any frontage works. Footpath and property alignment levels may be obtained from
Council’s Works Directorate upon request.
Stormwater Drainage
33. Roof and surface water is to be collected on site and is to be discharged through at least two
(2) separate underground drain lines into Bryan Street via Council’s street drainage system.
The maximum discharge allowable to Council’s kerb & channel at any one location is 25
litres/second.
In this regard, a Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued.
Headworks
34. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of September 2002 under the current policies is as follows:
Water Supply $ 3,570
Sewerage $ 2,696
TOTAL $ 6,266
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
36. The site shall be connected to Council's existing water supply and sewerage reticulation
systems and be constructed in accordance with Council’s standards and requirements at no
cost to Council.
37. Water meters shall be provided to each individual unit and shall extend from the water supply
system to the property boundary in accordance with Council's standards.
38. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
39. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Page 5 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 205 KB (small file)
- File type
No other editions are linked here.