               31.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel and footpath paving in accordance with Council’s Standard specifications prior to
                      commencement of the use permitted by this permit.
               32.    A Development Permit for Operational Works shall be obtained prior to the commencement
                      of any frontage works. Footpath and property alignment levels may be obtained from
                      Council’s Works Directorate upon request.
                      Stormwater Drainage
               33.    Roof and surface water is to be collected on site and is to be discharged through at least two
                      (2) separate underground drain lines into Bryan Street via Council’s street drainage system.
                      The maximum discharge allowable to Council’s kerb & channel at any one location is 25
                      litres/second.
                      In this regard, a Development Permit for Building Works shall not be granted until a
                      Development Permit for Operational Works has been issued.
                      Headworks
               34.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of September 2002 under the current policies is as follows:

                        Water Supply     $ 3,570

                        Sewerage         $ 2,696

                        TOTAL            $ 6,266

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.

                      Erosion and Sediment Control
               35.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
                      General
               36.    The site shall be connected to Council's existing water supply and sewerage reticulation
                      systems and be constructed in accordance with Council’s standards and requirements at no
                      cost to Council.
               37.    Water meters shall be provided to each individual unit and shall extend from the water supply
                      system to the property boundary in accordance with Council's standards.
               38.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               39.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.


                                                                                                        Page 5 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018

Used in these records

About this file

File size
205 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published].pdf · 205 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.