23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
Stage
A B1 B2 B3 C D
Current at December March March March March December
CPI 2004 2010 2010 2010 2010 2004
Bikeway $ 21,944 $ 5,338 $ 6,524 $ 10,083 $ 17,200 $ 1,247
Contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage of
the reconfiguration.
With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
contributions that will be assessed at the time of the future applications.
Sewer
96. The sewer network shall be generally in accordance with the approved ‘Sewerage Reticulation
Master Plan’ - Drawing 01691-130B by Eraland Consulting.
97. Design for a sewerage system to connect all new lots within the site to Council's existing
sewerage reticulation system shall be to the standards and requirements set out in Council’s
Engineering Design Standards. If the design requires the construction of a pump station and a
rising main, the connection point to Council's existing system will be nominated by the Manager
- Land Development.
98. Detailed design drawings and calculations shall be submitted with an application for a
Development Permit for Operational Works in respect of water or sewer works. To avoid conflict
with other underground pipes or services, all existing and proposed services required by the
development shall be shown on the plans.
99. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council. Any connection to a water main shall be undertaken by
Council.
Water
100. The water supply network shall be generally in accordance with the approved ‘Water Supply
Master Plan’ - Drawing 01691-140C by Eraland Consulting.
101. An application for a Development Permit for Operational Works for services shall be obtained
prior to commencement of works.
102. A reticulated water supply system shall be provided to connect to Council’s existing systems,
including a metered water connection to the property boundary of each proposed new lot within
the site. All fees for the supply of water meters shall be paid to the Council.
103. Fire hydrants are to be provided throughout the development in accordance with Council and
Queensland Fire Service standards.
104. Provision shall to be made in all parks locations for a water connection and should conform to
the recommendations of the Bushfire Management Plans. Under-road service conduits shall be
provided to ensure a connection is available.
Power, Telecommunications and Street Lighting
105. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
106. All lots are to be connected to underground power and telecommunications.
107. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
Page 17 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.