23616DA
General
115. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 are to be controlled on the site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of
natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient natural
regeneration of native species, the areas shall be replanted with endemic native species so that
a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
weed treatment and replanting is complete.
116. The following steps shall be undertaken prior to commencement of any construction:-
116.1.The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention
to commence works.
116.2.The Principal Contractor or any of his subcontractors shall not undertake any works
unless each contractor has public liability insurance in the sum of $10,000,000 and copies
of current public liability insurance policies are submitted to Council’s inspector.
116.3.The Principal Contractor shall nominate a site representative and give a telephone
number that can reach the site representative at any time during a 24-hour day.
116.4.The site representative shall arrange to meet on-site with Council's Inspector to obtain
Council's requirements for construction of access.
116.5.All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads
Division) Roadworks Signing Guide.
117. Prior to excavating any material to be used for fill on this site, a Development Permit for
Operational Works shall have been obtained for the site from which the excavated material is
taken. A soil report shall be submitted with the application certifying that the material is free of
acid sulphate soils and other deleterious materials.
118. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particulate matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
119. A program of works is to be submitted at the Prestart meeting detailing the construction
schedule and proposed environmental protection measures.
Where the program is changed for any reason whatsoever, a copy of the revised program shall
be submitted to Council’s Works Inspector within seven (7) days.
120. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work:
120.1.Site Civil Works;
120.2.Roadworks;
120.3.Stormwater Drainage;
120.4.Frontage works;
120.5.Sewer reticulation including new mains, relocations, diversions, pump stations and rising
mains;
120.6.Water reticulation;
Page 19 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.