23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
120.7.Site Filling;
120.8.Excavation of materials to fill another site; and
120.9.Landscaping.
121. Operational works shall be carried out in a manner that prevents:
121.1.Pollution of a waterway;
121.2.Dust/sand nuisance to residents in the vicinity;
121.3.Transfer of dirt and debris onto a public road;
121.4.Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries);
121.5.Excessive traffic delays (less than 5 minute delays); and
121.6.Diminution of neighbourhood amenity (long term parking of employees vehicles, parking
of construction equipment etc.).
122. A traffic management plan shall be submitted in conjunction with a Development Permit for
Operational Works involving road or drainage works. The plan shall address all phases of
construction to be undertaken on site.
123. Where operational works are likely to affect nearby residents and the Noosa Primary School, at
least 3 days notice of commencement of work, the name of the site supervisor, and a 24 hour
contact telephone number shall be distributed to affected residents.
124. Earthworks shall be generally contained within existing and proposed road reserves. Where
earthworks are required for the provision of services, existing contours shall be restored.
125. Fill imported to the site may only be from a site licensed with The Environmental Protection
Agency or from a site for which a Development Permit for Operational Works has been issued
approving the export of fill.
126. A registered practicing Geotechnical Engineer shall test the existing ground conditions for
suitability of placing additional fill, prior to such fill being placed.
127. Any existing fill or natural materials on the site or with the extent of approved works external to
the site which do not satisfy a Geotechnical Engineer's requirements shall be removed and
replaced with suitable material.
128. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No.
Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and
shall certify that all lots have been compacted to the required standard.
129. Following completion of the filling works and prior to endorsement of the Plan of Survey, the
registered practicing Geotechnical Engineer supervising the works shall submit compaction
tests across the entire filled areas and a site classification report for each lot subject to filling.
The extent of fill and each lot site classification shall be shown on a metes and bounds survey
plan.
130. An appropriate property notation shall be placed on Council's rates records to advise
prospective purchasers of lots that have been filled that special foundations requirements will
apply.
131. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining
properties to the reasonable satisfaction of the Manager - Land Development. A Development
Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.
132. The stormwater discharge from the site shall be designed such that there is no net increase in
the rate of discharge as a result of the development for storm events up to 100 year ARI.
Page 20 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.