Original source · versioned page text
Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]
location, level and type of all services and structures. All of which shall be submitted to
Council for checking and for Council’s records.
98. The data must fully detail levels for all engineering works including but not limited to
drainage structures, finished ground levels and pavement surface levels. The data shall
be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines
on the use of ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
Refuse
99. The developer shall provide waste and recycling storage and disposal facilities in
accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings
and Commercial and Industrial Premises”. The Waste Management Plan of Mark Rigby
and Associates dated February 2009 is not approved in its entirety. An amended Waste
and Recycling Management Plan (Operational) must be submitted for the day-to-day
operation of the development and approved by Council’s Waste and Resources
Management Branch prior to issue of development permit for operational works. The
amended plan shall include amongst other things –
a. Further details of the waste and recycling collection area on the south side of
Building A to show:
i. Full dimensions of the overall area and its likely increase in size to
accommodate the required bins.
ii. The number and types of bins stored there.
iii. The vehicle movement paths of the different general refuse and recycling
vehicles which must comply with the turning circles of AUSTROADS: design
single unit truck/bus (12.5m) template. This must allow easy and safe
collection for both front and rear loading and allow the required height
clearance.
b. The nine waste and recycling storage areas throughout the resort and residential
buildings and the external waste and recycling collection storage area are all to be
provided with their own individual bin washing facilities.
c. The waste and recycling storage areas shall include the provision of containers for
all waste and recycling materials including putresable matter, non-recycling waste,
paper/cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc.
d. The proposed separate refuse chutes (general refuse and recyclables) must be
provided in accordance with Council’s Policy for “Refuse Chutes and Accessories
in Multi Storey Buildings”. The recyclable chutes in Buildings A – C are to be used
in the same way as Buildings D – G.
100. A Construction Waste Management Plan shall be submitted and approved by Council’s
Waste and Resources Management Branch prior to issue of a development permit for
operational works. Waste Management Plans are required to be in accordance with
Planning Scheme Policy 11, Waste Management Plans see table below. Waste storage
areas are to provide for adequate separation of all reusable, recyclable and waste
materials. These shall be located so that they are convenient and safe to use (refer to
Noosa Council Waste Management Code).
The Plan shall contain the following information:
a. The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024 Page 13 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.