Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED]

of 20

Page text shows just the words. Original shows the document exactly as it was published.

                        location, level and type of all services and structures. All of which shall be submitted to
                        Council for checking and for Council’s records.
                 98.    The data must fully detail levels for all engineering works including but not limited to
                        drainage structures, finished ground levels and pavement surface levels. The data shall
                        be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines
                        on the use of ADAC are available at www.adac.com.au).
                        Approval of works shall not be granted until all As Constructed information has been
                        supplied and accepted by Council.
                        Refuse
                 99.    The developer shall provide waste and recycling storage and disposal facilities in
                        accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings
                        and Commercial and Industrial Premises”. The Waste Management Plan of Mark Rigby
                        and Associates dated February 2009 is not approved in its entirety. An amended Waste
                        and Recycling Management Plan (Operational) must be submitted for the day-to-day
                        operation of the development and approved by Council’s Waste and Resources
                        Management Branch prior to issue of development permit for operational works. The
                        amended plan shall include amongst other things –
                        a.     Further details of the waste and recycling collection area on the south side of
                               Building A to show:
                               i.      Full dimensions of the overall area and its likely increase in size to
                                       accommodate the required bins.
                               ii.     The number and types of bins stored there.
                               iii.    The vehicle movement paths of the different general refuse and recycling
                                       vehicles which must comply with the turning circles of AUSTROADS: design
                                       single unit truck/bus (12.5m) template. This must allow easy and safe
                                       collection for both front and rear loading and allow the required height
                                       clearance.
                        b.     The nine waste and recycling storage areas throughout the resort and residential
                               buildings and the external waste and recycling collection storage area are all to be
                               provided with their own individual bin washing facilities.
                        c.     The waste and recycling storage areas shall include the provision of containers for
                               all waste and recycling materials including putresable matter, non-recycling waste,
                               paper/cardboard, glass, aluminium/steel cans, waste oil, styrofoam boxes, etc.
                        d.     The proposed separate refuse chutes (general refuse and recyclables) must be
                               provided in accordance with Council’s Policy for “Refuse Chutes and Accessories
                               in Multi Storey Buildings”. The recyclable chutes in Buildings A – C are to be used
                               in the same way as Buildings D – G.
                 100. A Construction Waste Management Plan shall be submitted and approved by Council’s
                      Waste and Resources Management Branch prior to issue of a development permit for
                      operational works. Waste Management Plans are required to be in accordance with
                      Planning Scheme Policy 11, Waste Management Plans see table below. Waste storage
                      areas are to provide for adequate separation of all reusable, recyclable and waste
                      materials. These shall be located so that they are convenient and safe to use (refer to
                      Noosa Council Waste Management Code).
                        The Plan shall contain the following information:
                        a.      The site area for the storage and separation of waste is to be shown on the plan
                                drawings accompanying the application.




Document Set ID: 23307313
Version: 3, Version Date: 24/10/2024                                                                    Page 13 of 20
Log in to download the original file

Extension to Currency Period - Approved 132008.176.04 [AS PUBLISHED].pdf · 225 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.