Original source · versioned page text
2019-02-12 Planning & Environment Committee Agenda
The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
Water & Sewer Connections
6. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
7. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Building Appearance
8. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
Fencing and Walls
9. Any street fencing must be set back an average of 1 metre from the front property
boundary and articulated by stepping the design at maximum 5 metre intervals. Any
fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
10. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Clothes Drying Areas
11. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Community Management Statement
12. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
13. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice.
ENGINEERING
Site Access and Driveway
14. Vehicular access driveways to serve the development shall be constructed from the
Kauri Street and Olivine Street frontages of the site generally in accordance with the
final approved layout plans and as amended by the conditions of this permit and in
compliance with the applicable engineering standards and drawings.
15. Sealed access driveways must be provided from Kauri Street and Olivine Street
frontages of the site to all parking and manoeuvring areas of the development generally
in accordance with the final approved layout plans as amended by the conditions of
this permit. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Driveway crossovers generally in accordance with IPWEAQ standard drawings
R-049 and R-050, and to grades that prevent vehicles from scraping and/or
bottoming whilst also allowing for compliant grades and must match the levels of
any existing or proposed pathway and grassed verge without posing trip or safety
hazards to the public.
Page 15 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.