2019-02-12 Planning & Environment Committee Agenda

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              12 FEBRUARY 2019


          d.    As part of the application for operational works, the developer’s civil engineering
                consultant shall investigate and report on the possible deficiencies in the existing
                stormwater system, to the western end of Agate Street and including inspection
                by closed circuit television (CCTV) of the existing stormwater system. The
                developer is required to rectify any deficient stormwater pipes or structures
                extending from the development frontage down to and including the manhole
                downstream of the 600x1200 box culvert which crosses Kauri Street.
          e.    The design and construction of all works shall be carried out in accordance with
                Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
                Roads, Drainage and Earthworks and the applicable engineering standards
                current at the time of construction.
                The above condition is imposed pursuant to s145 of the Planning Act 2016 being
                non-trunk infrastructure.
    22.   All associated and ancillary work including pavement correction to the existing
          pavement, drainage works, modification of the footpath, and adjustments to the existing
          infrastructure shall be undertaken to complete the roadworks widening and must be
          carried out in accordance with the applicable engineering standards and the tree
          retention requirements of this approval.
          In this regard a schedule of works, specifications and plans detailing this work shall be
          prepared and submitted to Council for approval prior to obtaining a Development
          Permit for Operational Works
    23.   The applicant shall truncate the boundaries at the intersection of Kauri Street and
          Olivine Street and shall dedicate the truncated section as “Road”. The truncation shall
          be in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering Design
          Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication shall be
          undertaken at no cost to Council.
          Pathway and Frontage Works
    24.   A new 2.0m wide concrete path shall be constructed along the Kauri Street and Olivine
          Street frontages of the site in accordance with an Operational Works approval and to
          a desirable and smooth alignment for the comfort of users and protection of trees
          identified in this permit for retention. The new path shall be in compliance with IPWEAQ
          standard drawing SEQ R-065 Concrete Pathway Construction Details.
          The works must include a sufficient number of pram ramps to be provided near the
          intersection of Kauri Street and Olivine Street where identified by Council to connect to
          existing and proposed pathways network.
          The above condition is imposed pursuant to s145 of the Planning Act 2016 being non-
          trunk infrastructure.
    25.   All paths, pram ramps, driveways and parking areas shall be designed and constructed
          to ensure pedestrian safety using non-slip materials, to produce an evenly graded
          surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
          Australian Standard 1428.1 Design for Access & Mobility.
    26.   Footpath improvements such as topsoiling, grassing, tree retention and tree planting
          are required to the Kauri Street and Olivine Street frontages of the site in accordance
          with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines and in
          compliance with Operational Works approval.
    27.   The new path and frontage works must generally match the existing adjoining surfaces
          without causing a trip hazard and extend beyond the frontage where necessary to join
          and taper smoothly with any existing adjoining path and surfaces.



                                                                                    Page 17 of 94
Log in to download the original file

2019-02-12 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.