PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 FEBRUARY 2019
d. As part of the application for operational works, the developer’s civil engineering
consultant shall investigate and report on the possible deficiencies in the existing
stormwater system, to the western end of Agate Street and including inspection
by closed circuit television (CCTV) of the existing stormwater system. The
developer is required to rectify any deficient stormwater pipes or structures
extending from the development frontage down to and including the manhole
downstream of the 600x1200 box culvert which crosses Kauri Street.
e. The design and construction of all works shall be carried out in accordance with
Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
Roads, Drainage and Earthworks and the applicable engineering standards
current at the time of construction.
The above condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure.
22. All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the existing
infrastructure shall be undertaken to complete the roadworks widening and must be
carried out in accordance with the applicable engineering standards and the tree
retention requirements of this approval.
In this regard a schedule of works, specifications and plans detailing this work shall be
prepared and submitted to Council for approval prior to obtaining a Development
Permit for Operational Works
23. The applicant shall truncate the boundaries at the intersection of Kauri Street and
Olivine Street and shall dedicate the truncated section as “Road”. The truncation shall
be in accordance with Council’s Planning Scheme Policy PSP 5 – Engineering Design
Standards- Roads, Drainage and Earthworks part 3.13 (g). The dedication shall be
undertaken at no cost to Council.
Pathway and Frontage Works
24. A new 2.0m wide concrete path shall be constructed along the Kauri Street and Olivine
Street frontages of the site in accordance with an Operational Works approval and to
a desirable and smooth alignment for the comfort of users and protection of trees
identified in this permit for retention. The new path shall be in compliance with IPWEAQ
standard drawing SEQ R-065 Concrete Pathway Construction Details.
The works must include a sufficient number of pram ramps to be provided near the
intersection of Kauri Street and Olivine Street where identified by Council to connect to
existing and proposed pathways network.
The above condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
25. All paths, pram ramps, driveways and parking areas shall be designed and constructed
to ensure pedestrian safety using non-slip materials, to produce an evenly graded
surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
Australian Standard 1428.1 Design for Access & Mobility.
26. Footpath improvements such as topsoiling, grassing, tree retention and tree planting
are required to the Kauri Street and Olivine Street frontages of the site in accordance
with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines and in
compliance with Operational Works approval.
27. The new path and frontage works must generally match the existing adjoining surfaces
without causing a trip hazard and extend beyond the frontage where necessary to join
and taper smoothly with any existing adjoining path and surfaces.
Page 17 of 94
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.