Committee'sGuidelinesforBuildingWorks010709-Amended170615
Attached to the e-mail Body Corporate consent MCU16/0120.
F. Please submit final plans as early as possible to the Body Corporate Committee via the
Body Corporate Manager when you propose to commence development of your vacant
allotment. Please contact the Body Corporate Manager to ascertain current requirements
for these submissions.
Conditions Applying to Buildings under Construction
The Committee exercises control over building works to ensure that the security of the Estate is
maintained and access by residents is not unnecessarily affected during construction work. For these
reason the Body Corporate Committee provides the following Guidelines to owners, which will be
applied to builders undertaking construction works, delivery vehicles, maintenance personnel, and
service people.
Construction Hours
1. To comply with the residents’ right to ‘quiet enjoyment’, construction work inside the Estate is
strictly limited to between the hours of 7 am and 5 pm, Monday to Friday. Internal only, ‘quiet
work’, such as internal painting, may proceed outside of these hours as long as all other
Guidelines are followed.
Gate Access & Security
2. Owners must advise the Committee Chair of the planned construction start date and make
arrangements for access for everyone involved in construction. Access is to be by Lot security
code or remote controls during the constructions hours of 7 am to 5 pm on weekdays only.
3. The Body Corporate accepts no responsibility for Estate access. This must be arranged with the
owner of the allotment under construction directly.
4. Under no circumstances are the gates to be tampered with, removed, or disabled in ANY way.
Financial penalties will apply.
5. At the end of construction, all remotes should be accounted for by the owner and the gate code
will be changed. Owners will be issued with a new access code.
Restrictions on Transport Size & Weight
6. Due to the narrowness and construction of the private roads within the Estate and the tight turns
on Estate roundabouts, strict limits are in place on the size and weight of vehicles entering the
estate.
7. Trucks longer than 11 metres or more than 28 ton in weight are STRICTLY PROHIBITED from
entering the estate. Financial penalties will apply.
8. All ARTICULATED VEHICLES regardless of length are PROHIBITED. Long experience tells us
that while these vehicles may be able to enter the estate– they cannot get out! Exiting has
required the unhitching of the trailer and several hours of reversing. Do NOT disregard this rule
and make sure all material delivery companies are also advised of these limits.
9. Large vehicles may park outside the Estate gates and be unloaded using smaller vehicles.
10. In addition, the access road at the southern end leading to lots 31, 32, 33 and 34, and the
pedestrian beach access roads at the northern and southern end of the Estate are of light
construction. As such they are vulnerable to damage, so builders must exercise appropriate care
when constructing on allotments in or near these areas. No Parking is permitted in these
areas at any time.
11. These limits are the direct result of considerable damage to roads, walls, gates, curbing, lawns,
irrigation and trees throughout the Estate during previous home constructions. Owners are
responsible for compliance with these bans during and after construction, and builders should
note vehicle sizes for deliveries and construction tasks before commencement of construction.
R:\26506NoosaDunes\Legal\Committee'sGuidelinesforBuildingWorks010709-Amended170615.doc Page 2 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.