Committee'sGuidelinesforBuildingWorks010709-Amended170615
Attached to the e-mail Body Corporate consent MCU16/0120.
Body Corporate Authority
23. The owner of the allotment is responsible to the Body Corporate to ensure that the builder
adheres to these guidelines and takes care to ensure all other sub contractors and workers are
also aware.
24. The Body Corporate, or their authorised agent, will approach builders where necessary to bring
their attention to any practices in breach of Body Corporate guidelines. The owner is further
required to ensure that if approached by Body Corporate, or their authorised agent, that builders
react professionally, positively and favourable to the direction provided.
25. In the event there are issues that cannot be resolved through direct approach to the builder, the
owner will be requested to attend a meeting with the Body Corporate Committee to reach
agreement regarding day to day compliance. Owners will be encouraged to invite their builders to
this meeting.
Insurance
26. Prior to building start, the Builder is required to lodge a copy of his current public liability and
contract works insurance, and provide a certificate of currency nominating the building site
address.
Conclusion
27. The Body Corporate Committee seeks the owner’s active cooperation in ensuring that builders
meet their commitment to these guidelines and diligently manage all those subcontracted to the
site. Although the Body Corporate Committee has no direct control over the builders, it will make
every effort to seek the cooperation of construction teams. Ultimately, however it will be the
allotment owner’s legal and moral responsibility to ensure compliance with these guidelines and
Body Corporate requests, and to minimise the disruption to other residents during construction
as much as possible.
28. Owners and their appointed Builders are required to sign and return one copy of these Guidelines
to the Body Corporate, prior to building start.
29. (Item added following 2013 AGM) As provisioned under By Law 24.3 (e) the Body Corporate
request you also provide certification by a Licenced Building Surveyor that:
a. All construction falls 100% within the building envelop and no encroachment is made into the
zones noted as ‘natural vegetation zones to remain untouched’.
b. No area of the roof exceeds 8 Metres above natural ground level, or lower if your Lot is
covered by an RL)
We look forward to your cooperation in regard to these matters.
Yours faithfully,
Committee for Noosa Dunes
(Noosa Dunes CTS 26506)
Please sign & return the following page to addressee.
R:\26506NoosaDunes\Legal\Committee'sGuidelinesforBuildingWorks010709-Amended170615.doc Page 4 of 5