and property from flooding is Map in Schedule 2, the finished
avoided or minimised. floor level of habitable rooms is at
least 300 millimetres above the
Defined flood event (DFE).
OR
AO16.2 Where the DFE has not
been modelled for the area, the
finished floor level of habitable
rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory
provisions MP3.5 also apply to the
construction of buildings in flood
hazard areas.
Major Electricity Infrastructure AO18.1 Development including any Not applicable
& Substations sensitive land uses is at least: The site is not mapped as
PO18 Development is sufficiently 1. 50 metres from a containing major electricity
separated from major electricity transmission substation; infrastructure or substations.
infrastructure and substations to 2. 10 metres from any other
minimise the likelihood of nuisance substation; and
or complaint.
3. 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are not Not applicable
located within an easement for a The site is not mapped as
distribution line. containing major electricity
infrastructure or substations.
PO19 Development is located and AO19 Noise emissions do not Not applicable
designed to avoid or minimise noise exceed 5db(A) above background The site is not mapped as
nuisance from the use of noise level internal to a habitable containing major electricity
infrastructure. building measured in accordance infrastructure or substations.
with AS1055.
PO20 Wherever practicable AO20 Where adjoining substations Not applicable
habitable buildings are orientated to or major electricity infrastructure, The site is not mapped as
avoid direct overlooking of major habitable buildings are orientated containing major electricity
electricity infrastructure or so that the majority of outdoor infrastructure or substations.
substations. living areas and windows of
habitable rooms face away from the
infrastructure.
Earthworks and Drainage AO21 Filling other than Can comply with AO21
accessways:
PO21 Earthworks and drainage
operational works do not directly, 1. does not extend more than
indirectly or cumulatively cause the equivalent of 3 metres around
adverse impacts external to the the main building, measured from
26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.