and property from flooding        is Map in Schedule 2, the finished
avoided or minimised.                floor level of habitable rooms is at
                                     least 300 millimetres above the
                                     Defined flood event (DFE).


                                     OR


                                     AO16.2 Where the DFE has not
                                     been modelled for the area, the
                                     finished floor level of habitable
                                     rooms is at least 500 millimetres
                                     above the highest recorded flood.


                                     Editor's Note—The QDC mandatory
                                     provisions MP3.5 also apply to the
                                     construction of buildings in flood
                                     hazard areas.

Major Electricity Infrastructure AO18.1 Development including any Not applicable
& Substations                       sensitive land uses is at least:   The site is not mapped as
PO18 Development is sufficiently 1.          50     metres      from a containing major electricity
separated from major electricity transmission substation;              infrastructure or substations.
infrastructure and substations to 2.         10 metres from any other
minimise the likelihood of nuisance substation; and
or complaint.
                                    3.       30     metres      from a
                                    transmission line easement.


                                     AO18.2 Habitable buildings are not Not applicable
                                     located within an easement for a The site is not mapped as
                                     distribution line.                 containing major electricity
                                                                        infrastructure or substations.

PO19 Development is located and AO19 Noise emissions do not                  Not applicable
designed to avoid or minimise noise exceed 5db(A) above background           The site is not mapped as
nuisance     from   the   use    of noise level internal to a habitable      containing major electricity
infrastructure.                     building measured in accordance          infrastructure or substations.
                                    with AS1055.

PO20        Wherever       practicable AO20 Where adjoining substations      Not applicable
habitable buildings are orientated to or major electricity infrastructure,   The site is not mapped as
avoid direct overlooking of major habitable buildings are orientated         containing major electricity
electricity     infrastructure      or so that the majority of outdoor       infrastructure or substations.
substations.                           living areas and windows of
                                       habitable rooms face away from the
                                       infrastructure.

Earthworks and Drainage            AO21      Filling    other     than Can comply with AO21
                                   accessways:
PO21 Earthworks and drainage
operational works do not directly, 1.     does not extend more than
indirectly or cumulatively cause   the equivalent  of 3 metres around
adverse impacts external to the    the main  building, measured from



                                                                                                        26
Log in to download the original file

Town Planning Assessment Report (1).pdf · 12.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.