Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

BR190571 BP Noosaville - Preliminary Construction Management Plan

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4         Maintenance and Protection of Existing Services
The following will be implemented to protect the existing service lines in and around the construction
area:
   Dial Before You Dig Report
   Verification of report through independent service locator
   Making all information readily available to any persons digging on site

 4.1      Services / Utility Authorities
Prior to commencing notifiable works to services, relevant approvals will be achieved from asset owners
and managers, including:
   Noosa Council
   Unity Water
   Energex
   NBN / Telstra (and other private telecoms)
   APA




 P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx                             Page 9 of 13
Log in to download the original file

BR190571 BP Noosaville - Preliminary Construction Management Plan.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.