Original source · versioned page text
BR190571 BP Noosaville - Preliminary Construction Management Plan
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4 Maintenance and Protection of Existing Services The following will be implemented to protect the existing service lines in and around the construction area: Dial Before You Dig Report Verification of report through independent service locator Making all information readily available to any persons digging on site 4.1 Services / Utility Authorities Prior to commencing notifiable works to services, relevant approvals will be achieved from asset owners and managers, including: Noosa Council Unity Water Energex NBN / Telstra (and other private telecoms) APA P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx Page 9 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.