BR190571 BP Noosaville - Preliminary Construction Management Plan
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3 Traffic Management 3.1 External Traffic Management External traffic management will be undertaken during the construction of the site dependent on the location and stage of works on site at the time. 3.2 Internal Traffic Management Due to the requirements of the stores remaining open over the construction period, safety measures are to be taken to ensure that customers can safely access the car parking and operating on the BP premises. 3.3 Internal Deliveries During each stage of the development, a location will be set for construction deliveries to the site that will have minimal impact on the construction and open store. 3.4 Traffic Management Control Plan To be confirmed by the contractor after project award. The contractor’s Traffic Management Plan will be submitted to Noosa Council for approval. 3.5 Maintenance of Safe Pedestrian Access Safe pedestrian routes including signage and boundary are to be provided at all times throughout the site. 3.6 Traffic Management Approvals / Permits Prior to carrying out any temporary modification of surrounding traffic arrangements, lane closures, footpath closures, or any other notifiable activity, the contractor will apply for permits from Noosa Council and/or Department of Transport and Main Road. This may include: Application / Notification to Work on Council Property Footpath Closure Permit Temporary Lane / Road Closure Application Application for Permit to Occupy Road Permits to float over-size plant and equipment onto site out of hours Signs and Line Marking Operational Works P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.