Original source · versioned page text
BR190571 BP Noosaville - Preliminary Construction Management Plan
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.7 Roads and Transport Networks Approval will be sought from any road and or transport authority (DTMR, Queensland Transport, TransLink etc.) before commencing any works that may affect these authorities. Pre-start meeting will be established for continued updates/status of interface works with the relevant authority assets if required. 3.8 Proposed Fencing All temporary fencing, hoarding and signage will be designed and built in accordance with relevant legislation, codes of practice and Australian Standards. All perimeter fencing shall be at a minimum height of 1.8m and be covered with shade cloth or hard protection to prevent construction materials from exiting the site. 3.9 Worker Car Parking Due to the location of the site, all workers car parking will be offsite. It will be recommended to contractors to use public transport where possible. P:\BR19\BR190571 BP Noosaville\Reports\CMP\BR190571 BP Noosaville - CMP.docx Page 8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.