Mcu
Attached to the e-mail MCU19/0013 - Withdraw Representations.
Noosa Council documents
v. provision for worker car parking.
d. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures.
e. works programme identifying key components of the works and their respective
durations.
f. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues.
g. identification of complaint management procedures including:
i. contact details for the on-site manager.
ii. dispute resolution procedures.
h. it is acknowledged that the preliminary Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor employed
to construct the works and a final document will be required to be submitted at the Pre-
Start Meeting for the project.
Community Title Scheme - Private Infrastructure
4. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority.
Infrastructure Charges
5. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the planning legislation
and regulations current at the time of issue.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Frontage Works, Access, Landscaping &
Stormwater
Development Permit for Building Works All building works
Compliance Certificate Plan Sealing
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Page 6 of 9
Document Set ID: 20860721
Version: 7, Version Date: 13/05/2019 Print Date: 13 May 2019, 4:45 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.