Original source · versioned page text
2015-06-29 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 29 JUNE 2015
Government Priority Comment
Replacing the Queensland Planning Provisions with more focussed standard The DILGP suggestion is that the QPP will be split so that necessary or
requirements for planning schemes that improves consistency whilst removing mandatory content will live in a regulation to the Act. They may still provide
requirements that add unnecessary complexity and length to local planning model codes or model template but this is less likely to be mandatory.
schemes
There is benefit in a State-wide consistent approach to planning schemes such
as having a template for consistent structure, consistency of
technical/administrative definitions, use definitions and even the name and
colour of zones. However agree to removal of any aspects not absolutely
necessary – particularly for smaller regional Councils where this would seem
particularly onerous.
Simplifying the hierarchy for State level planning documents with anything from Sounds reasonable
the current instruments that still needs to be regulated (including retention of the
Urban Footprint and koala protections) being moved to the regulation (or other
instruments)
Introducing better processes for plan making, with the step by step detail not set The removal of process from the Act would be appropriate.
in the legislation, allowing local government more flexibility to innovate in process
and engagement. This flexibility will include a default “minimum” path at the local The current Statutory Guideline for Making and Amending Local Planning
government’s discretion. Instruments is very prescriptive, onerous and gives little flexibility for smaller
amendments or amendments with a limited area of influence.
Preparing a new statutory guideline that introduces new community engagement
standards for local government in the plan-making process, in consultation with Noosa Council typically does considerably more than the minimum prescribed
councils and communities consultation, however the engagement proposal should be fit for purpose.
Retaining statutory minimum consultation periods of 60 business days on The community should be afforded the opportunity to comment on the
regional plans preparation and amendment of local and state planning instruments. There is
discontent when they can only comment on local planning instruments if
Retaining statutory timeframes for public notification of proposed local planning Regional or State plans over rule these anyway.
schemes
If the requirements for all new or amended plans (including local regional or
Retaining statutory requirements for consideration of public submissions state) were contained in the regulations and they allowed for flexibility so the
currently in SPA, including requirements for keeping proposed schemes on consultation suited the scope and nature of the plan/amendment it would be an
public display, rights to make submissions, consideration of submissions and improvement
reporting to the Minister
Page 16 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.