Information Response
Performance outcomes Acceptable Outcomes Compliance
OR
AO16.2
Where the DFE has not been modelled for the area,
the finished floor level of habitable rooms is at least
500 millimetres above the highest recorded flood.
Editor's Note—The QDC mandatory provisions
MP3.5 also apply to the construction of buildings in
flood hazard areas.
PO17 Not relevant to this application.
Underground car parking areas are designed to No acceptable outcome provided
drain and function safely during a flood event and
power failure.
Editor's note—Basements should have flood
immunity above the 1%AEP defined flood event with
alternative means to mechanical pumping used to
achieve such immunity.
Major Electricity Infrastructure & Substations Alternate solution proposed to A018.1
PO18 AO18.1 The secondary dwelling is setback 27.9m from the transmission
Development is sufficiently separated from major Development including any sensitive land uses is at line easement. The proposed secondary dwelling is setback
electricity infrastructure and substations to minimise least: greater than 58m (approx.) from the overhead lines. The proposed
the likelihood of nuisance or complaint. siting of the secondary dwelling clearly provides adequate
1. 50 metres from a transmission substation; separation and does not compromise the operation of the
2. 10 metres from any other substation; and electricity infrastructure. Compliance is therefore achieved with
3. 30 metres from a transmission line easement. PO18.
AO18.2
Habitable buildings are not located within an
easement for a distribution line.
PO19 AO19 Not relevant to this application
Development is located and designed to avoid or Noise emissions do not exceed 5db(A) above There is no noise associated with the overhead electricity
minimise noise nuisance from the use of background noise level internal to a infrastructure.
infrastructure. habitable building measured in accordance with
AS1055.
PO20 AO20 Not relevant to this application.
Wherever practicable habitable buildings are Where adjoining substations or major electricity
orientated to avoid direct overlooking of major infrastructure, habitable buildings are orientated so
electricity infrastructure or substations. that the majority of outdoor living areas and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.