Skip to the record
The only place to find full transcripts.

Council archive · source document

Project Hazard Risk Management Ozcare Noosa RACF 23-04-2024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

3. IMPLEMENTATION
3.1 RESOURCES – HUMAN, PHYSICAL AND FINANCIAL
Woollam management shall ensure, where necessary, that adequate resources are available, such as to maintain a high level
of Work health and safety standards and ensure that risk is managed at an acceptable level.

3.2 INTEGRATION
Woollam aims to benefit from the integration of the Work Health and Safety Management System in other Management
Systems, such as:
    •   Training and Development
    •   Communication and Reporting
    •   Resource Allocation
    •   Quality Assurance
    •   Design and ECI

3.3 ORGANISATIONAL CHART
Project related reporting routes within the company are as illustrated and associated responsibilities are detailed in section
3.4:




                                                         OHS Management Manual / 14/02/2024 / Page 12 Approved by - HSEQT Manager

Used in these records

About this file

File size
550 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard Risk Management Ozcare Noosa RACF 23-04-2024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 550 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.