3.13 PURCHASING GOODS AND MATERIALS
Project Managers and Site Managers will ensure that purchase specifications for any goods, including items of plant and
chemical substances, include the requirement to comply with WHS Legislation and relevant Standards as per the Workplace
Health and Safety Conditions of Contract.
Purchase orders will require the supplier to provide relevant WHS documentation, such as a SDS or evidence of mobile plant
maintenance and plant risk assessments.
Hazardous substances must be listed in the Hazardous Substances Register and a risk assessment performed and a SDS
must be provided to the Site Manager before they are brought onto site.
3.14 EMERGENCY PREPAREDNESS
Woollam Constructions has identified the most likely potential emergency situations for construction activities. These
situations and appropriate actions are recorded on the Emergency Response and Preparedness Plan. The Emergency
Response Plan for the specific project will be included with the WHS Management Plan for the project and displayed at the
workplace.
At the beginning of the project and before construction activities begin The HSEQT Manager / Regional HSE Coordinator, in
conjunction with the Site Manager and Project Manager, shall determine the emergency equipment required for the project
and record this information on the Emergency Preparedness and Response plan. The HSEQT Manager or Regional HSE-
Coordinator should hold a minimum a Cert 4 BSB41419 Work Health and Safety or equivalent.
The location of the equipment will be demonstrated on the Emergency Evacuation Plan.
Qualified persons (first aid certification) shall identify site first aid equipment and requirements in accordance with relevant
legislation, codes of practice and Australian standards.
Woollam Constructions will ensure inspection, test and maintenance requirements for emergency and first aid equipment are
identified, scheduled and undertaken.
All Woollam Constructions’ Site Mangers, Leading Hands will undertake Emergency Response Training prior to commencing
on site with records sent to HR.
Workers and visitors will be provided the information via site specific induction.
Once a site has been established an Emergency Evacuation Diagram will be developed taking into account any site-specific
issues. The Emergency Evacuation Diagram will be recorded on the Emergency Evacuation Diagram Template and displayed
at a prominent location on site.
The Emergency Scenarios identified in the Emergency Preparedness and Response Plan will be drilled as prescribed during
the plans creation or every three months and recorded on the Emergency Drill Evaluation or on Procore / Sign-onsite and in
the Site Diary.
OHS Management Manual / 14/02/2024 / Page 29 Approved by - HSEQT Manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard Risk Management Ozcare Noosa RACF 23-04-2024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 550 KB (small file)
- File type
No other editions are linked here.