Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Request to Change Current Application · OPW11/0023

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

     BUNNINGS WAREHOUSE, NOOSAVILLE
     SURFACE WATER MANAGEMENT PLAN                                                 C") Car dna

                 The final size and design of the tank will depend upon site conditions, and will be confirmed
                 at the detailed design stage. At this stage, some obvious conclusions may be drawn from
                 the data above; increasing the irrigation rate decreases reliability, but larger tanks served
                 by larger roof areas increase reliability.

                 However, these effects cannot necessarily be extrapolated to reach a guaranteed 100%

I                performance target. The vagaries of rainfall mean that in reality, with a sensibly sized tank
                 serving a realistic roof area, some dry periods will be experienced. The commercial cost of
                 this shortfall must be compared with the capital costs inherent in the tank.

                 To conclude, a 100 kL tank could supply a demand of 3500 litres per day with 95%
                 reliability (utilising all of the available roof area). If only 50% reliability is required, then a 10
                 kL tank would suffice (supplied by only half of the roof area). At this point a tank size of
                 100kL is recommended to provide 95% reliability.

                 The model tends towards a conservative assessment in that a daily supply has been
                 modelled. As described in previous sections, in periods of natural rainfall the artificial
                 irrigation demand of the nursery would decrease (watering being required perhaps every
                 other day). This effect would lead to a modest improvement on the above figures.




I




1

I   Bunnings Warehouse
    J \3501-54\WP\SWMP.doc
                                                          Version 1
                                                    Commercial in Confidence
                                                                                                      15 December 2006
                                                                                                                Page 15

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.