I   BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN
                                                                           C"*-*) Cardna
    6.         MAINTENANCE REQUIREMENTS

              6.1         Construction Phase & Sediment Control

              During the construction phase, the potential exists for significant increases in the
              amount of pollutants, particularly sediment, exported from the site. During this period,
              an Erosion and Sediment Control Plan is required as part of the overall Environmental
              Management Plan prepared for the construction phase. The erosion and sediment
              control plan for the site would be completed in accordance with Soil Erosion and
              Sediment Control, Engineering Guidelines for Queensland Construction Sites
              (Institution of Engineers Australia, 1996).

              The completion of construction activities in accordance with an Erosion and Sediment
              Control Plan developed using the above guidelines will minimise the nature of any
              adverse impacts during the construction phase. It is considered that the appropriate
              time for the preparation of the Erosion and Sediment Control Plan is at the Operational
              works stage. Further, it is expected that the requirement to prepare a plan will be a
              condition of any development approval issued with respect to the site.

              Performance indicators for the construction phase will be set as part of the overall EMP for
              the construction phase and in agreement with Council. Should non-compliance with the
              performance indicators occur, the following corrective actions are to be implemented:

                      •   Identification of the cause of the non-compliance;
                      •   Implementation of appropriate mitigation measures as determined by the
                          Contractor in consultation with the Consultant; and
                      •   Relevant validation monitoring to confirm that the nominated corrective
                          actions have been effective.

              It is envisaged that the detention basin will first be constructed as a sediment basin to treat
              runoff during the construction phase, and the same would apply to the car park landscape
              divides to a lesser extent. At the end of construction, the basin and swales would have any
              accumulated sediment removed and the vegetation installed (and the filter, in the case of
              the bio-retention devices). As there is likely to be a significant pollutant load generated as
              the Warehouse is first opened to the public, it may be necessary to replace the filter media
              at intervals until the vegetation is fully established.

              6.2         Ongoing Maintenance
              The proposed maintenance for the bio-retention systems is drawn from the Melbourne
              Water publication WSUD Engineering Procedures: Stormwater (June 2004, Chapter 6):

                     "The most intensive period of maintenance is during the plant establishment
                     period (first two years) when weed removal and replanting may be required. It
                     is also the time when large loads of sediments could impact on plant growth
                     particularly in developing catchments with poor building controls.




    Bunnings Warehouse                               Version 1                                15 December 2006
    J\3501-54\WRSWMPdoc                        Commercial in Confidence                               Page 16

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.