Minor Change Existing Approval - RAL19 0018.01 (As Published)
f. maintenance of suitable access (pedestrian and vehicle) to 21 Wilgee Court during the
construction phase of the works
Condition 12 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
13. A new intersection must be constructed joining proposed Road 1 with Lake MacDonald Drive.
The works must be undertaken in accordance with an Operational Works approval and be
generally in accordance with the intersection works described in the Traffic Assessment
reference 2019080-rpt001-Rev A prepared by 360 Civil Consulting dated 25 October 2019.
The works must include but not be limited to:
a. intersection with vehicle priority maintained to Lake MacDonald Drive
b. the recommended configuration (basic right turn – BAR and basic left turn – BAL)
c. provision of sight distances adequate for the design speed of the roads
d. relocation of any existing services
e. truncation of the subject site’s boundaries where necessary to provide adequate space
for all required road works and utility services.
Condition 13 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
New Roads
14. The new Road 1 shown on the Approved Plans must be constructed in accordance with the
conditions of this Decision Notice and dedicated as road reserve at no cost to Council. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a reserve width of 20 metres and widened where necessary to encompass the cul-de-
sac head/intersection works
b. the works must include a formation for a “rural settlement – local road” as described in
Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and
Earthworks (6m kerb to kerb)
c. installation of street lighting, services, linemarking and signage where necessary
d. a cul-de-sac with a circular turning area of sufficient size to accommodate the single
forward motion turn of a Waste Collection Vehicle (10.2m long WCV) and in
accordance with section 3.12 of Planning Scheme Policy 5 – Engineering Design
Standards – Roads, Drainage and Earthworks.
Condition 14 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
15. Deleted.
Property Accesses and Driveways
16. A driveway must be constructed to all lots. The driveway must extend from the road formation
to the building pads. The works must be undertaken in accordance with an Operational
Works approval and include in particular:
a. a 4m formation and include passing opportunities
b. the formation must be sealed where:
a. grades are in excess of 12%,
b. the formation is in sag and may be effected by stormwater, and
c. the driveway is within 50m of a house site on an adjoining property
c. the shared driveway within Lot 4 providing access to Lot 8 must be sealed for the full
length within Lot 4 (4m seal on 4m formation) with passing opportunities where required
Page 4 of 15
Document Set ID: 24931816
Version: 3, Version Date: 13/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original