NOOSA COUNCIL IDAS Development Application Decision Notice 4
10 The formal car parking area shall be drained and the constructed with gravel pavement using materials
that minimise dust.
The access from the property boundary to the car park area shall be constructed to access road
standards except as a sealed road for the first 100 metres from the property boundary and gravel
thereafter using materials consistent with the formal car park area. Plans and specifications for these
works shall be submitted in conjunction with an application for a Development Permit for Operational
Works.
11 Provided that the use authorised by this permit has not lapsed, all carparking shall be kept maintained
and line-marked in a condition fit for use to the reasonable satisfaction of the Manager-Land
Development.
12 A contribution toward roadworks external to the development site in the Cootharaba Road catchment
shall be paid prior to the commencement of this approved use. The amount of the contribution as at
September 1999 is $100,000 and shall be subject to changes in the Consumer Price Index, All Groups
Brisbane, up until the date of payment
13 Prior to the commencement of the use, Kabi Road shall be upgraded to local road standard of 6m seal
on 8m gravel formation for its full length from the intersection with Cootharaba Road to the development
site, at no cost to Council. Subject to satisfactory traffic management being incorporated into the
design of Kabi Road and fill batters being at a maximum grade of 1:6, the gravel pavement width may
be reduced to 7 metres. Design details to be submitted in conjunction with the application for a
development permit for operational works.
14 No Council property of facility shall be interfered with during works associated with this development.
15 All designs for engineering works involving the construction of pavements, kerb and channel, vehicular
access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be
prepared in accordance with the requirements of Council's Engineering Design Standards, shall
reference where applicable to Council’s Standard Drawings and shall incorporate best engineering
practice.
16 A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works which shall be submitted in conjunction with an application for a
Development Permit for Operational Works.
17 Prior to commencement of the use, a certificate shall be submitted to Council from a registered
Professional Civil Engineer certifying that he has supervised all operational works and that all works
have been completed in a workmanlike manner in accordance with good engineering practice and in
accordance with the permits/approvals required pursuant to this permit.
18 The following steps are undertaken prior to commencement of any construction on a public road:
The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
commence works.
The Principal Contractor or any of his subcontractors shall not undertake any works unless each
contractor has public liability insurance in the sum of $10,000,000 and copies of current public
liability insurance policies are submitted to Council’s inspector.
The Principal Contractor shall nominate a site representative and give a telephone number that
can reach the site representative at any time during a 24 hour day.
The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
requirements for construction of access.
All signage, including that for safety during construction, shall be in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide.
19 The transportation of all materials to and from the development site shall be undertaken in a manner
such that no particulate matter escapes onto a public road. All vehicles carrying materials either to or
from the development site shall be covered to prevent materials including dust being windblown from
the vehicle.
20 A program of works is to be submitted with any application for a Development Permit for Operational
Works detailing the construction schedule and proposed prevention measures.
Where the program is changed for any reason whatsoever, a copy of the revised program shall be
submitted to Council’s Works Inspector within seven (7) days.
SMP o:\database\ipa\town planning\decision.doc
Print Date: 7 September 2021, 10:32 AM