NOOSA COUNCIL IDAS Development Application Decision Notice                                                      6


Park Contributions

33.   A Park contribution of $5,489 towards the acquisition of additional parkland or the improvement of existing
      parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit
      for Operational Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements.
      This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      December 2005 until the date of payment.
Frontage Works

34.   The proposed works in the road reserve shall be in accordance with plan DA-01c-OPTIONC prepared by
      Foster Designs and dated March 2006. The landscaping against the kerb shall use plants of a maximum
      mature height of 300mm. The width of pathway around the corner of Gympie Terrace and Thomas Street
      shall be maintained at a minimum width of 2.5 metres on the corner. The width of the pathway shall be
      maximized at all times for pedestrian useability.

35.   A new full width concrete or paved path shall be constructed along the Thomas Street and Gympie
      Terrace frontages of the site in accordance with Council’s design standards. Provision shall for street tree
      planting shall include pedestrian friendly permeable surfaces around the root system of those trees a
                      2
      minimum of 1m . Care shall be taken to protect any underground services.

36.   A pram ramp shall be installed at the roundabout of Gympie Terrace and Thomas Street (on the Gympie
      Terrace frontage) in accordance with the Disability Discrimination Act 1992 and Australian Standard
      AS1428.1-2001 “Design for access and mobility”.

37.   The existing pram ramp in Thomas Street shall be upgraded to comply with the Disability Discrimination
      Act 1992 and Australian Standard AS1428.1-2001 “Design for access and mobility”.

38.   All paths and pram ramps shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.

39.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
      paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
      prior to commencement of the use permitted by this permit.

Roadworks Contributions (Local Road Network)

40.   A roadworks contribution of $2,145.40 towards safety improvements to Gympie Terrace shall be paid to
      the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the date of
      payment.
Pathway Contributions
41.   A pathway contribution of $1,234 towards external major pathways, in accordance with Planning Scheme
      Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
      Development Permit for Operational Works. This amount will be subject to variations in the Consumer
      Price Index, All Groups Brisbane from December 2005 until the date of payment.
Undergrounding Power
42.   A contribution of one third of the cost of undergrounding the overhead electricity wires to the Gympie
      Terrace and Thomas Street frontage of the development shall be paid to Council prior to commencing the
      use. Conduits shall be installed along the site’s full frontages to Gympie Terrace and Thomas Street to
      the satisfaction of Council and Energex.

Stormwater Drainage

43.   All stormwater drainage shall be collected on site and discharged so there is no net increase in
      stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
      to Council’s kerb & channel street drainage system in both Gympie Terrace and Thomas Street. Plans of
      the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted to
      Council prior to obtaining a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c044668\@[email protected]

Used in these records

About this file

File size
78 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Compiled Decision Notice [As Published].pdf · 78 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.