Slope Stability - lindsays
LINDSAY CONSULTING PTY LTD -
STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
Specific requirements concerning various sections of the construction process are given
below:-
CONSTRUCTION ELEMENT NOTES AND REQUIREMENTS
The cut/fill platform for the residence shall be minimized to
avoid disturbance to the soil profile
Building and other structure’s foundations
ALL FOUNDATIONS SHALL BE PROVIDED WITH
SCREW PILES AS PER THE ENGINEERING
DRAWINGS
The site is sewered. Trenching shall be minimised to avoid
Sewage disposal
disturbance to the soil profile.
The site stormwater shall be directed to road at the front of
Stormwater disposal the allotment. Trenching shall be minimised to avoid
disturbance to the soil profile.
From the driveway plan provided by the draftsman minimal
External works including driveways, retaining
cutting (approx. 1000 mm MAX) is required along the
walls, pools, etc
driveway minimizing possible disturbance to the soil profile.
Loss of existing vegetation shall be limited around the
Loss of existing Vegetation
residence to minimize disturbance to the soil profile.
A landslip Hazard Frequency analysis has been carried out for the site and the proposed
works, refer Appendix F, and we conclude there is a low risk of site instability with the
house located in its proposed location. The low risk of instability as defined in the
guidelines in the attached appendix does not exclude slope stability problems, only that
in Lindsay Consulting Pty Ltd’s opinion that the risk is low and may be management
through good hillside practises.
In our professional opinion, the present site conditions along with the proposed
earthworks detailed on the drawings specified previously do not pose a slope stability
issue with the site including associated buildings and infrastructure and that the stability
of the site will be maintained during both the construction and operational life of the
development. As such the works proposed, when carried out in a capable manner will
not lead to a slope stability problem.
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.