RFI - Attachment C - Civil Engineering Report

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 45, section 1. The text section number identifies this passage in the reader.

EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A

              PERFORMANCE OUTCOMES                                                  ACCEPTABLE OUTCOMES                                              RESPONSE

PO2                                                                AO2.1                                                       RO2.1

Works in a watercourse                                             Work within waterways must be undertaken in accordance      Not applicable – No works are proposed to be undertaken
                                                                   with Best Practice Erosion and Sediment Control,            within waterways.
Construction activities within watercourses are planned to         Appendix I – Instream works, Sections 14 and 16
prevent erosion, construction failure and associated               International Erosion Control Association 2008.
sedimentation.




                                                                   AO2.2                                                       RO2.2
                                                                   Temporary vehicular crossings of waterways must be          Not applicable – No works are proposed to be undertaken
                                                                                                                               within waterways.
                                                                   designed and constructed to convey flows for the
                                                                   50%AEP event and remain stable for all rainfall events up
                                                                   to 10%AEP event.




l:\7000-7999\7700-7799\7700\codes\01-08-18 erosion and sediment control code.docx
                                                                                            Page 3
Log in to download the original file

RFI - Attachment C - Civil Engineering Report.pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.