EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
PO2 AO2.1 RO2.1
Works in a watercourse Work within waterways must be undertaken in accordance Not applicable – No works are proposed to be undertaken
with Best Practice Erosion and Sediment Control, within waterways.
Construction activities within watercourses are planned to Appendix I – Instream works, Sections 14 and 16
prevent erosion, construction failure and associated International Erosion Control Association 2008.
sedimentation.
AO2.2 RO2.2
Temporary vehicular crossings of waterways must be Not applicable – No works are proposed to be undertaken
within waterways.
designed and constructed to convey flows for the
50%AEP event and remain stable for all rainfall events up
to 10%AEP event.
l:\7000-7999\7700-7799\7700\codes\01-08-18 erosion and sediment control code.docx
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.