Original source · versioned page text
2015-05-26 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 26 MAY 2015
Some of the projects that have commenced recently include:
• Tewantin Cooroy Noosa Road Rehabilitation Stage 1
• Tewantin Pathway Upgrade & Lighting
• Noosaville Gympie Terrace Pipe Rehabilitation
• Sunrise Beach Ben Lexcen Drive Pipe re-lining
• Noosaville Primary School safety improvements
• Tewantin Primary School safety improvements
In addition to these projects commencing we have a number of upcoming projects being
undertaken through May & June and these include:
• Cootharaba Dr Pages Road and Kinmond Creek road sealing Design
• Noosa heads Park Road boardwalk Design
• Noosaville William Street Pathway
• Tewantin Cooroy Noosa Rd stage 2 – 6
• Tewantin Daintree Estate Stage 2
In addition to these projects, there are a number of projects that are nearing completion by
the end of May or early June:
• Noosaville Lions Park, Pirate Playground Renewal
• Information Technology Mobility project
• Multiple Bus Stop Shelter Upgrades (approx. 5)
• Noosaville Wallace Park Pathways
• Noosaville Gibson Road – Road Safety improvements
• Lake Macdonald Botanical Gardens Pathway Renewal
Botanical Gardens Pathway Renewal Works
Page 4 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.