Log in to see the plans as drawn Levels of service
Performance Level of Service Measure Measurement Target
Measure Criteria
Maintenance to Audit of 100% of items in
prescribed Maintenance maintenance
Standards Contract contract are
based on SRS performed or
facility usage accounted for.
Beach Profile The beach profile The beach Survey against No more than 1
is maintained in an profile is design profile. instance per year
acceptable maintained that the beach
condition. above the profile falls below
minimum design, ideally for
design profile. a period no
greater than a
week outside of a
significant event.
Quality The SRS Facility Defects Number of No greater than
is maintained in defects/period 10 defects per
acceptable year for SRS
condition as per (excluding
IIMM definitions vandalism) And
all defects must
be prioritised and
rectified
Condition of Percentage of More than 90%
SRS Facility SRS assets in of the SRS
condition 3 or assets in
better condition 3 or
better
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 24