2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Preventive
Maintenance,
10- 10- Routine
AC1 AC1 Compressor Compressor Maintenance 1M Mechanical 0.5 1 $ - $ -
Preventive
Low Pressure Maintenance,
UV- UV- Discharge Routine
001 001 Isolation Valve Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
High Pressure
Discharge Line Preventive
to Beach Maintenance,
UV- UV- System Routine
004 004 Isolation Valve Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
Preventive
Slurry Sea Maintenance,
LCV- LCV- Water Make-up Routine
005 005 line No.2 Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
Preventive
Slurry Sea Maintenance,
UV- UV- Water Make-up Routine
008 008 line No.1 Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
Preventive
Slurry Sump Maintenance,
UV- UV- Intake Isoaltion Routine
010 010 Valve Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
High Pressure
Line to Slurry Preventive
Sump Intake Maintenance,
UV- UV- Line Control Routine
011 011 Valve Valve Maintenance 1M Mechanical 0.25 1 $ - $ 10.00
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 26