2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Security Predictive
1043 1043 Fencing Fencing Maintenance 1M Mechanical 0.5 1 $ - $ -
Sea Water Predictive
1051 1051 Pump Station Site Maintenance 3M Mechanical 1 1 $ - $ -
Sand Pumping Predictive
1052 1052 Station Site Maintenance 3M Mechanical 1 1 $ - $ -
Predictive
1001 1001 Intake Jetty Jetty Maintenance 6M Mechanical 1 2 $ - $ -
Preventive
Maintenance,
10- 10- Sand Clearing Routine
SP2 SP2 Pump Pump Maintenance 6M Mechanical 1.5 2 $ - $ 20.00
Predictive
1005 1005 Handrails Handrails Maintenance 6M Mechanical 0.5 1 $ - $ -
Predictive
1006 1006 Floor Grating Grating Maintenance 6M Mechanical 0.5 1 $ - $ -
Predictive
1007 1007 Jetty Pipework Pipework Maintenance 6M Mechanical 1 1 $ - $ -
Preventive
10- Maintenance,
SP1- Routine
01 Slurry pump Pump Maintenance 6M Mechanical 0.5 1 $ - $ -
COMMS
Switchboard Predictive
1020 1020 UPS UPS Maintenance 6M Contractor 1 1 $ 20.00 $ 10.00
Overhead Predictive
1023 1023 Crane Crane Maintenance 6M Contractor 0.5 1 $ 20.00 $ 20.00
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 27