2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Preventive
Maintenance,
DIT- DIT- Routine
014 014 Densitometer Meter Maintenance 6M Electrical 1 1 $ - $ -
Preventive
Maintenance,
FIT- FIT- Routine
012 012 Flow Meter Meter Maintenance 6M Contractor 1 1 $ - $ 40.00
Preventive
Maintenance,
LIT- LIT- Level Routine
009 009 transmitter Instrument Maintenance 6M Electrical 0.5 1 $ - $10.00
HDPE 1.6 km Predictive
1041 1041 discharge pipe Pipe Maintenance 6M Mechanical 1 1 $ - $ -
Building No.1 Predictive
1042 1042 Pipework Pipework Maintenance 6M Mechanical 1 1 $ - $ -
Site Fire Predictive
1053 1053 Extinguishers Site Maintenance 6M Contractor 1 1 $ 100.00 $50.00
Emergency Predictive
1054 1054 Lighting Site Maintenance 6M Electrical 1 1 $ 50.00 $15.00
Preventive
10- Sea Water Maintenance,
WP1- pump No.1 Routine
03 Pump Pump Maintenance 1Y Mechanical 2 2 $ - $20.00
Preventive
10- Sea Water Maintenance,
WP1- pump No.1 Routine
04 Motor Motor Maintenance 1Y Electrical 1 1 $ - $10.00
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 28