Original source · versioned page text
2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Preventive
Maintenance,
1048- High-pressure Routine
01 pump Motor Motor Maintenance 1Y Electrical 1 1 $ - $ -
Preventive
10- Maintenance,
WP3- Low-pressure Routine
03 pump Pump Maintenance 1Y Mechanical 2 2 $ - $ 20.00
Preventive
Maintenance,
1049- Low-pressure Routine
01 pump Motor Motor Maintenance 1Y Electrical 1 1 $ - $ -
Predictive
1017 1017 MCC MCC Maintenance 1Y Electrical 4 2 $ 100.00 $ 50.00
COMMS Predictive
1019 1019 Switchboard Switchboard Maintenance 1Y Electrical 1 2 $ 25.00 $ 15.00
10- 10- Predictive
SU1 SU1 Slurry Sump Structure Maintenance 1Y Mechanical 1 1 $ - $ -
Preventive
Maintenance,
10- 10- Routine
KS1 KS1 Screen No.1 Screen Maintenance 1Y Mechanical 0.5 2 $ - $ -
Preventive
Maintenance,
10- 10- Routine
KS2 KS2 Screen No.2 Screen Maintenance 1Y Mechanical 0.5 2 $ - $ -
1001- Predictive
01 Intake Jetty Jetty Maintenance 3Y Civil 2 2 $ - $ -
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.