Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       CH2M                                                                            Duration
 Asset Asset       Asset                     Maintenance                                of task   No. of
  No. Id No.     Description    Asset Type     Strategy   Calendar Hours Discipline     (hours)   Staff        Parts           Consumables
                                              Preventive
         10-   Sea Water                     Maintenance,
        WP1-   pump No.1                       Routine
         01    Pump               Pump       Maintenance           1000 Mechanical           1         1   $     20.00     $         15.00
                                              Preventive
         10-   Sea Water                     Maintenance,
        WP1-   pump No.1                       Routine
         02    Pump               Pump       Maintenance           10000 Mechanical          4         1   $    200.00     $         50.00
               Sea Water
 HV-     HV-   Pump No.2
 002     002   Check Valve        Valve      Run to failure                                  0         0   $           -   $            -
               Sea Water
               Intake Pump
 1002   1002   Bellow             Bellow     Run to failure                                  0         0   $           -   $            -
 1003   1003   Jetty Lighting    Lighting    Run to failure                                  0         0   $           -   $            -
 FSL-   FSL-
  024    024   Flow Switch        Switch     Run to failure                                  0         0   $           -   $            -
               Cables and
 1009   1009   Cable Trays        Cable      Run to failure                                  0         0   $           -   $            -
 1010   1010   Building No.1     Building    Run to failure                                  0         0   $           -   $            -
 1011   1011   Pump Room          Room       Run to failure                                  0         0   $           -   $            -
                                              Preventive
         10-                                 Maintenance,
        WP2-   High-pressure                   Routine
         01    pump               Pump       Maintenance           1000   Mechanical         1         1   $     50.00     $         20.00




Asset Management Plan: Noosa Main Beach Sand Recycling System                                                                                Page 31
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.