2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH2M Duration
Asset Asset Asset Maintenance of task No. of
No. Id No. Description Asset Type Strategy Calendar Hours Discipline (hours) Staff Parts Consumables
Preventive
10- Sea Water Maintenance,
WP1- pump No.1 Routine
01 Pump Pump Maintenance 1000 Mechanical 1 1 $ 20.00 $ 15.00
Preventive
10- Sea Water Maintenance,
WP1- pump No.1 Routine
02 Pump Pump Maintenance 10000 Mechanical 4 1 $ 200.00 $ 50.00
Sea Water
HV- HV- Pump No.2
002 002 Check Valve Valve Run to failure 0 0 $ - $ -
Sea Water
Intake Pump
1002 1002 Bellow Bellow Run to failure 0 0 $ - $ -
1003 1003 Jetty Lighting Lighting Run to failure 0 0 $ - $ -
FSL- FSL-
024 024 Flow Switch Switch Run to failure 0 0 $ - $ -
Cables and
1009 1009 Cable Trays Cable Run to failure 0 0 $ - $ -
1010 1010 Building No.1 Building Run to failure 0 0 $ - $ -
1011 1011 Pump Room Room Run to failure 0 0 $ - $ -
Preventive
10- Maintenance,
WP2- High-pressure Routine
01 pump Pump Maintenance 1000 Mechanical 1 1 $ 50.00 $ 20.00
Asset Management Plan: Noosa Main Beach Sand Recycling System Page 31