Skip to the record
Accept no substitutions.

Original source · versioned page text

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       CH2M                                                                              Duration
 Asset Asset       Asset                      Maintenance                                 of task   No. of
  No. Id No.     Description    Asset Type      Strategy     Calendar Hours Discipline    (hours)   Staff        Parts           Consumables
                                               Preventive
         10-                                  Maintenance,
        WP3-   Low-pressure                     Routine
         01    pump               Pump        Maintenance             1000 Mechanical          1         1   $     20.00     $       15.00
                                               Preventive
         10-                                  Maintenance,
        WP3-   Low-pressure                     Routine
         02    pump               Pump        Maintenance             10000 Mechanical         4         1   $    200.00     $       50.00
                                               Preventive
         10-                                  Maintenance,
        AC1-                                    Routine
         01    Compressor      Compressor     Maintenance             2000 Contractor          1         1   $    100.00     $      50.00
 1012   1012   Exhaust fan         Fan        Run to failure                                   0         0   $         -     $               -
 1013   1013   Control Room       Room        Run to failure                                   0         0   $         -     $               -
 1014   1014   PC               Computer      Run to failure                                   0         0   $         -     $               -
               Control Room
               Air                 Air
 1015   1015   Conditioning     Conditioner   Run to failure                                   0         0   $           -   $               -
 1016   1016   MCC Room           Room        Run to failure                                   0         0   $           -   $               -
               MCC Air             Air
 1018   1018   Conditioning     Conditioner   Run to failure                                   0         0   $           -   $               -
 1021   1021   Toilet Room        Room        Run to failure                                   0         0   $           -   $               -
 1022   1022   Toilet             Toilet      Run to failure                                   0         0   $           -   $               -




Asset Management Plan: Noosa Main Beach Sand Recycling System                                                                                    Page 32
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 6 - Sand Recycling System Asset Management Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.