Council archive · source document
Appendix F - Council Report - Change Application 28.2.19 · 51997.2302.01
Attached to the e-mail Change to DA Condition 4 (Cover over Restaurant) - 51997.2302.01.
Noosa Council documents
Town Planning Consent Permit - 11893 TC Page 7
35. The developer is to construct all walkways on the site in accordance with Council
requirements regarding grade, alignment and finishes.
In addition, the developer is to construct a drainage system along the western boundary
of the site to intercept any surface stormwater. In this regard, plans prepared by a
registered civil engineer are to be submitted to and approved by the Shire Engineer,
prior to the issue of a Building Approval.
36. Connection to Council's existing water supply and sewerage reticulation systems at the
developer's expense to the standards and requirements of Council's Shire Engineer.
37. The developer shall provide metered water connections from the water supply system to
the proposed development, in accordance with Council's standards and to the
satisfaction of the Shire Engineer.
38. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into existing drainage in Hastings Street to the satisfaction of the
Shire Engineer. A Building Approval shall not be granted until the Shire Engineer has
approved of the drainage scheme.
39. Engineering drawings are to include sediment and erosion control plans from suitably
qualified consultants to be approved by the Shire Engineer. The plans are to show how
stormwater runoff within and from the site is to be controlled during construction. The
plans are to indicate measures to be taken to prevent erosion and the export of sediment
from the site and will embrace the basic principles set out in the Institution of Engineers
Australia Draft Engineering Guideline for Queensland Soil Erosion and Sediment
Control November 1994.
40. Advice from the Beach Protection Authority indicates that the existing rock protection
wall on the seaward side of the property is not capable of handling a storm surge of 1 in
10 years recurrence interval and will be overtopped under severe storm conditions.
The property owner should ensure that any improvements on the site are adequately
protected from wave inundation. Independent advice should be sought from a suitably
qualified professional engineer specialising in coastal engineering, as to whether any
additional protection works are required within the property boundary to afford greater
protection in the event that the sea overtopped or breached the rock protection wall.
c:\users\noo.ecm.prod.web.svc\appdata\local\temp\4894c4ec-8cdd-4444-be14-b0cba2d65697.doc
Print Date: 10 December 2018, 9:45 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix F - Council Report - Change Application 28.2.19.pdfRelated documentApplication case desk ↗
About this file
- File size
- 494 KB (small file)
- File type
No other editions are linked here.