Original source · versioned page text
information request mcu14.0039
MCU14/0039 (b) Include methods to be undertaken to ensure the protection of the buildings and other structures in the case of a flood event; and (c) Include methods to be undertaken to ensure that hazardous material and other chemicals are not transported by flood waters in the case of a flood event. Stormwater 3 Provide a preliminary stormwater design plan for the development, prepared by an RPEQ. The design must include any necessary stormwater detention or treatment features, any features/methods required for erosion and sediment control, and indicate the various features required for the construction and operational phases. The design must demonstrate compliance with the Queensland State Planning Policy’s Water Quality Code and The Noosa Plan, which include details about control, detention and treatment. Soil and Groundwater Protection Despite low percent concentrations, substantial accumulative loads of nutrients including Calcium, Potassium, Nitrate, Magnesium and Sulphate are proposed to be discharged into the soils beneath the greenhouses. The application states that the grasses surrounding the greenhouse will uptake the nutrients from the unused effluent. However, the application also comments that the sides of the greenhouse will extend 50cm below the ground. This is expected to direct waters containing the nutrients away from the rootzone of grasses, to either leach down to groundwater then migrate to the adjoining creek system or affect the in situ soil Cation/Anion exchange balances, soil structure and future agricultural potential for the site. Other concerns associated with the accumulation of 10,000L of nutrient enriched water per day being discharged, include any impact to soil structure as a result of groundwater level rises. 4 In lieu of isolating all nutrient enriched effluent from the natural system, a report must be provided by a suitably qualified and experienced Soil and Groundwater Specialist to demonstrate the capacity of soils beneath the greenhouse to absorb the excess nutrient loads and impacts of the effluent on groundwater levels, soil structure and nutrient migration to the adjoining Six Mile Creek. The Soil and Groundwater Specialist report must demonstrate that environmental harm to soils, groundwater and nutrient loads within Six Mile Creek will not result from the irrigation and fertilisation proposed, or can be appropriately managed and demonstrate that the proposal will comply with Specific Outcome O5 of the Agricultural Use Code and Specific Outcome O4 (b) of the Biodiversity Overlay Code. Riparian Buffer The development of the greenhouses is proposed within the mapped Riparian Buffer Area. Specific Outcome O5 of the Biodiversity Overlay Code seeks new development is not sited within the Riparian Buffer Area, as well as avoiding edge effects and incompatible uses within the buffer. 5 Provide an assessment of the proposal against the provisions of the Biodiversity Overlay Code Outcomes, including: (a) Detailing all proposed and existing infrastructure, including drainage features, to be located within the mapped Riparian Buffer Area; (b) Provide an assessment of the proposed and existing infrastructure with relation to the specific outcomes of the Biodiversity Overlay Code; Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.