Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

7.3 QUANTITY MUSIC MODEL RESULTS


Quantity MUSIC Modelling returned the following results:-

   •    Average Annual Incident Rainfall                        19.32 ML/Year

   •    Average Annual Infiltration to Water Table              19.32 ML/Year

   •    Average Annual Overflow Off site                             0 ML/Year

   •    Average Annual Percentage Infiltration to Water Table           100%
   •    Average Annual Percentage Overflow Off Site                       0%


By inspection criteria of no nett reduction in infiltration over the developed
site has been demonstrated.




__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 14 of 9
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.