Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

8.0 STORMWATER QUALITY

Stormwater runoff from roofed and hardstand areas is to be treated prior to
infiltration via small bioretention basins surrounding discrete RIPs and a
large consolidated bioretention basins adjacent the RIC .

Piped low flows (<3 month ARI) from catchments to be treated will generally
discharge to bioretention surfaces while larger flows will discharge directly to
RIPs/RIC.

Rainwater harvesting and re-use will be employed as discussed in Section 5.0.

Largely soft-landscaped catchments 4/1, 4A/1 and 4B/1 are to be directed to
the ephemeral stream (vegetated swale) constructed along the external
catchment drainage line discussed in Section 5.

Existing vegetated areas where no significant works are proposed are
excluded from modelling on the basis that they will continue to infiltrate
incident rainfall as per the existing pre-development case.

Infiltration via RIPs/RIC is conservatively ignored in the Quality MUSIC
Model.




8.1 QUALITY MUSIC MODEL

The efficiency of the proposed treatment train has been identified by the
Model for Urban Stormwater Improvement Conceptualisation
(MUSICXV1.1.0) developed by Monash University.

A conceptual layout of the treatment train as input to the Quality MUSIC
Model is shown in Figure 8.1




__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 15 of 9
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.